本文二维码信息
二维码(扫一下试试看!)
Construction andApplication of A Flexible Flow-shop Optimization Scheduling Model Based on NSGA-II Algorithm
Received:November 06, 2019  
DOI:10.11981/j.issn.1000-6842.2020.04.57
Key Words:multi-objective optimization;flow-shop;NSGA-II;production scheduling
Author NameAffiliationPostcode
ZHANG Huanhuan* State Key Lab of Pulp and Paper Engineering, South China University of Technology, Guangzhou, Guangdong Province, 510640 510640
LI Jigeng State Key Lab of Pulp and Paper Engineering, South China University of Technology, Guangzhou, Guangdong Province, 510640 510640
HONG Mengna State Key Lab of Pulp and Paper Engineering, South China University of Technology, Guangzhou, Guangdong Province, 510640 510640
MAN Yi State Key Lab of Pulp and Paper Engineering, South China University of Technology, Guangzhou, Guangdong Province, 510640 510640
Hits: 2870
Download times: 2002
Abstract:
      In order to solve the problem of efficient optimized production scheduling in papermaking enterprises, the machine operation rate should be the highest, the product switching times, and the time of supplying products should be met the requirement of customer. A two-stage flexible flow-shop scheduling optimization model with cost minimization and make span minimization as optimization objectives was constructed and a fast non-dominated genetic algorithm (NSGA-II) was used to solve the model. The results showed that compared with manual production scheduling, the production scheduling results obtained by NSGA-II shorten the makespan by about 6.5% and reduce the production cost by about 4.7%.
View Full Text  View/Add Comment  Download reader  HTML

share